This project included a medical office building and facilities that added 91,000 square feet of outpatient care to Kaiser’s primary Santa Rosa healthcare complex at Bicentennial Way.
The bio-retention system at Kaiser Medical Office Building 5 in Santa Rosa was designed to serve the entire Kaiser Campus for storm water detention and treatment.
Adobe Associates, Inc. Civil Engineering and Land Surveying departments provided the following services:
- Entitlement Consultation
- Topographic Mapping
- Boundary Survey
- Site Improvement Design (roadway, utility and grading & drainage)
- Stormwater Mitigation
- Permit Processing
- Construction Administration
- Construction Staking
- Public Liaison
Notable Project Features:
This project incorporates sustainable features such as bioswales and a bioretention pond.